Gym Building Update (July 19, 2024)

Good day fellow friends of St. Methodios.

This week we saw the last of the trim going on the building.  The wonderful looking white trim was the finishing touches on the outside of the building.

Outside the building saw the following:

Preparation of concrete pad for propane generator.
Fire water line pressure test preparation.
Bury the underground electrical pipe.
Bury the underground domestic water pipe.

The new utility pole was set by Eversource.

Propane tanks arrived for position on the property near the new building.

The septic tank hole is being prepared.

The storm drainage pond is 75% complete.

Great progress in another great week at St. Methodios.

God Bless