Gym Building Update (July 26, 2024)
Posted On 26 July 2024
Good day. Herewith the report for the Juiy 26, 2024 progress on the gymnasium for St. Methodios.
This week saw the following:
- Establish the power pole to the property and arrange the ground connection backboard for electrical hook up.
- Final measurements for the doors and windows of the lobby area of the center.
- Propane tanks delivered and installed (underground).
- Septic tank hole dug.
- Geneator pad prepared.
- Backfill of all open conduit run chases.
- Storm drainage retention pond 75% complete.
We look forward to future updates.