Gym Building Update (July 26, 2024)

Good day.  Herewith the report for the Juiy 26, 2024 progress on the gymnasium for St. Methodios.

This week saw the following:

  • Establish the power pole to the property and arrange the ground connection backboard for electrical hook up.
  • Final measurements for the doors and windows of the lobby area of the center.
  • Propane tanks delivered and installed (underground).
  • Septic tank hole dug.
  • Geneator pad prepared.
  • Backfill of all open conduit run chases.
  • Storm drainage retention pond 75% complete.

We look forward to future updates.